Dirt

So much digging. So much dirt. 

The second floor addition requires a lot of foundation work. They have to tear out sections of the floor in order to dig out the holes for the new bigger concrete footings needed to carry the added load.

Ground Floor Bedroom (this was a closet)

We are also digging out a “nook” in the crawl space so that the furnace can go under the house instead of taking up floor space in the small basement. (I like that, I’m going to call it my furnace nook from now on.) Unfortunately all of this dirt has to come out by hand. It’s hard work for these guys. They dug out an access portion in the side yard in order to avoid taking every bucket of dirt up the stairs.   (This is also where the gas line is–don’t worry, we had it shut down at the street by utilities before we started demo work.)


Side Yard excavation at foundation–that also happens to be the gas line, two of them(?)…hopefully the utility guys will work that out…

Basement Wall after demo–but before removing extra dirt
The Furnace Nook (I know, it’s not all that impressive yet–but they did take out a good -sized pile of dirt!)